# Data Strategy Guide — Implementation Workbook

Version: 1.0
Published: 2026-07-27
Last updated: 2026-07-27
Owner: Rusaka Research
Review frequency: Every 6 months

## Decision statement

What decision must this workbook support?

________________________________________________________________________________

## Scope and exclusions

In scope:

________________________________________________________________________________

Out of scope:

________________________________________________________________________________

## Baseline evidence register

| Evidence item | Source | Date | Owner | Verified by | Status |
|---|---|---|---|---|---|
| | | | | | |
| | | | | | |
| | | | | | |

## Assumption register

| Assumption | Rationale | Decision affected | Downside case | Test | Owner | Review date |
|---|---|---|---|---|---|---|
| | | | | | | |
| | | | | | | |

## Options and decision criteria

| Option | Outcome | Feasibility | Cost | Time | Risk | Reversibility | Recommendation |
|---|---:|---:|---:|---:|---:|---:|---|
| | | | | | | | |
| | | | | | | | |

## Implementation plan

| Phase | Entry evidence | Actions | Owner | Control | Exit evidence | Due date |
|---|---|---|---|---|---|---|
| 1. Operations — Data Strategy Guide | | During operations, use Data Strategy Guide to move from an informed decision to controlled execution. Start with representative data, process volumes, error rates, human effort, current outcomes, and documented data rights. Name the accountable owner, the evidence reviewer, the decision deadline, and the output that proves this stage is complete. Record exclusions and unresolved questions rather than allowing them to disappear into narrative. The stage closes only when its evidence can be reproduced by someone who did not prepare it. | | | Required output: a decision record, implementation plan, and review log. | |
| 2. Discovery — Data Strategy Guide | | During discovery, use Data Strategy Guide to move from an informed decision to controlled execution. Start with representative data, process volumes, error rates, human effort, current outcomes, and documented data rights. Name the accountable owner, the evidence reviewer, the decision deadline, and the output that proves this stage is complete. Record exclusions and unresolved questions rather than allowing them to disappear into narrative. The stage closes only when its evidence can be reproduced by someone who did not prepare it. | | | Required output: a decision record, implementation plan, and review log. | |
| 3. Design — Data Strategy Guide | | During design, use Data Strategy Guide to move from an informed decision to controlled execution. Start with representative data, process volumes, error rates, human effort, current outcomes, and documented data rights. Name the accountable owner, the evidence reviewer, the decision deadline, and the output that proves this stage is complete. Record exclusions and unresolved questions rather than allowing them to disappear into narrative. The stage closes only when its evidence can be reproduced by someone who did not prepare it. | | | Required output: a decision record, implementation plan, and review log. | |
| 4. Pilot — Data Strategy Guide | | During pilot, use Data Strategy Guide to move from an informed decision to controlled execution. Start with representative data, process volumes, error rates, human effort, current outcomes, and documented data rights. Name the accountable owner, the evidence reviewer, the decision deadline, and the output that proves this stage is complete. Record exclusions and unresolved questions rather than allowing them to disappear into narrative. The stage closes only when its evidence can be reproduced by someone who did not prepare it. | | | Required output: a decision record, implementation plan, and review log. | |
| 5. Scale — Data Strategy Guide | | During scale, use Data Strategy Guide to move from an informed decision to controlled execution. Start with representative data, process volumes, error rates, human effort, current outcomes, and documented data rights. Name the accountable owner, the evidence reviewer, the decision deadline, and the output that proves this stage is complete. Record exclusions and unresolved questions rather than allowing them to disappear into narrative. The stage closes only when its evidence can be reproduced by someone who did not prepare it. | | | Required output: a decision record, implementation plan, and review log. | |

## Measures and thresholds

| Measure | Definition | Source | Baseline | Target | Threshold | Owner | Frequency |
|---|---|---|---:|---:|---:|---|---|
| | | | | | | | |
| | | | | | | | |

## Risk and control register

| Risk | Cause | Impact | Preventive control | Detective control | Owner | Residual risk |
|---|---|---|---|---|---|---|
| | | | | | | |
| | | | | | | |

## Review checklist

- [ ] 1. Review and renewal: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 2. Decision boundary: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 3. Stakeholder map: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 4. Current-state baseline: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 5. Evidence design: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 6. Operating model: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 7. Architecture and integration: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 8. Risk and compliance: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 9. Economics and value: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 10. Delivery sequencing: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 11. Vendor and partner assessment: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 12. Measurement system: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 13. Quality assurance: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 14. Change management: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.

## Approval record

| Role | Name | Decision | Conditions | Date |
|---|---|---|---|---|
| Accountable owner | | | | |
| Subject-matter reviewer | | | | |
| Risk or control reviewer | | | | |

## Authoritative references

- https://www.nist.gov/data — Authoritative reference 1 for the evidence and standards relevant to Data Engineering and Analytics. Confirm the current version and applicability before relying on it.
- https://www.iso.org/committee/45342.html — Authoritative reference 2 for the evidence and standards relevant to Data Engineering and Analytics. Confirm the current version and applicability before relying on it.
- https://data.gov.in/ — Authoritative reference 3 for the evidence and standards relevant to Data Engineering and Analytics. Confirm the current version and applicability before relying on it.

## Related Rusaka resources

- https://www.rusaka.com/resources/guides
- https://www.rusaka.com/resources/directories/open-data-sources-directory
- https://www.rusaka.com/resources/guides/modern-data-stack-guide
- https://www.rusaka.com/resources/guides/marketing-analytics-dashboard
- https://www.rusaka.com/resources/glossary/analytics-metrics-library

## Important limitation

This educational workbook does not replace legal, investment, tax, accounting,
security, clinical, regulatory, or other qualified professional advice. Confirm
current requirements and obtain formal organisational approval where applicable.
