# MVP Framework — Implementation Workbook

Version: 1.0
Published: 2026-07-27
Last updated: 2026-07-27
Owner: Rusaka Research
Review frequency: Every 6 months

## Decision statement

What decision must this workbook support?

________________________________________________________________________________

## Scope and exclusions

In scope:

________________________________________________________________________________

Out of scope:

________________________________________________________________________________

## Baseline evidence register

| Evidence item | Source | Date | Owner | Verified by | Status |
|---|---|---|---|---|---|
| | | | | | |
| | | | | | |
| | | | | | |

## Assumption register

| Assumption | Rationale | Decision affected | Downside case | Test | Owner | Review date |
|---|---|---|---|---|---|---|
| | | | | | | |
| | | | | | | |

## Options and decision criteria

| Option | Outcome | Feasibility | Cost | Time | Risk | Reversibility | Recommendation |
|---|---:|---:|---:|---:|---:|---:|---|
| | | | | | | | |
| | | | | | | | |

## Implementation plan

| Phase | Entry evidence | Actions | Owner | Control | Exit evidence | Due date |
|---|---|---|---|---|---|---|
| 1. Design — MVP Framework | | During design, use MVP Framework to make comparable decisions with a consistent structure. Start with dated financial statements, operating metrics, contractual terms, and a reconciled assumption register. Name the accountable owner, the evidence reviewer, the decision deadline, and the output that proves this stage is complete. Record exclusions and unresolved questions rather than allowing them to disappear into narrative. The stage closes only when its evidence can be reproduced by someone who did not prepare it. | | | Required output: a completed framework, rationale, and exception register. | |
| 2. Pilot — MVP Framework | | During pilot, use MVP Framework to make comparable decisions with a consistent structure. Start with dated financial statements, operating metrics, contractual terms, and a reconciled assumption register. Name the accountable owner, the evidence reviewer, the decision deadline, and the output that proves this stage is complete. Record exclusions and unresolved questions rather than allowing them to disappear into narrative. The stage closes only when its evidence can be reproduced by someone who did not prepare it. | | | Required output: a completed framework, rationale, and exception register. | |
| 3. Scale — MVP Framework | | During scale, use MVP Framework to make comparable decisions with a consistent structure. Start with dated financial statements, operating metrics, contractual terms, and a reconciled assumption register. Name the accountable owner, the evidence reviewer, the decision deadline, and the output that proves this stage is complete. Record exclusions and unresolved questions rather than allowing them to disappear into narrative. The stage closes only when its evidence can be reproduced by someone who did not prepare it. | | | Required output: a completed framework, rationale, and exception register. | |
| 4. Operations — MVP Framework | | During operations, use MVP Framework to make comparable decisions with a consistent structure. Start with dated financial statements, operating metrics, contractual terms, and a reconciled assumption register. Name the accountable owner, the evidence reviewer, the decision deadline, and the output that proves this stage is complete. Record exclusions and unresolved questions rather than allowing them to disappear into narrative. The stage closes only when its evidence can be reproduced by someone who did not prepare it. | | | Required output: a completed framework, rationale, and exception register. | |
| 5. Discovery — MVP Framework | | During discovery, use MVP Framework to make comparable decisions with a consistent structure. Start with dated financial statements, operating metrics, contractual terms, and a reconciled assumption register. Name the accountable owner, the evidence reviewer, the decision deadline, and the output that proves this stage is complete. Record exclusions and unresolved questions rather than allowing them to disappear into narrative. The stage closes only when its evidence can be reproduced by someone who did not prepare it. | | | Required output: a completed framework, rationale, and exception register. | |

## Measures and thresholds

| Measure | Definition | Source | Baseline | Target | Threshold | Owner | Frequency |
|---|---|---|---:|---:|---:|---|---|
| | | | | | | | |
| | | | | | | | |

## Risk and control register

| Risk | Cause | Impact | Preventive control | Detective control | Owner | Residual risk |
|---|---|---|---|---|---|---|
| | | | | | | |
| | | | | | | |

## Review checklist

- [ ] 1. Risk and compliance: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 2. Economics and value: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 3. Delivery sequencing: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 4. Vendor and partner assessment: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 5. Measurement system: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 6. Quality assurance: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 7. Change management: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 8. Documentation: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 9. Scenario analysis: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 10. Security and resilience: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 11. Data governance: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 12. Capability and resourcing: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 13. Scale readiness: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 14. Review and renewal: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.

## Approval record

| Role | Name | Decision | Conditions | Date |
|---|---|---|---|---|
| Accountable owner | | | | |
| Subject-matter reviewer | | | | |
| Risk or control reviewer | | | | |

## Authoritative references

- https://www.sebi.gov.in/ — Authoritative reference 1 for the evidence and standards relevant to Startups and Venture Capital. Confirm the current version and applicability before relying on it.
- https://www.startupindia.gov.in/ — Authoritative reference 2 for the evidence and standards relevant to Startups and Venture Capital. Confirm the current version and applicability before relying on it.
- https://www.ycombinator.com/documents — Authoritative reference 3 for the evidence and standards relevant to Startups and Venture Capital. Confirm the current version and applicability before relying on it.

## Related Rusaka resources

- https://www.rusaka.com/resources/frameworks
- https://www.rusaka.com/resources/guides/startup-validation-guide
- https://www.rusaka.com/resources/templates/startup-financial-model
- https://www.rusaka.com/resources/frameworks/ai-strategy-framework
- https://www.rusaka.com/resources/frameworks/go-to-market-framework
- https://www.rusaka.com/resources/calculators/startup-valuation-calculator

## Important limitation

This educational workbook does not replace legal, investment, tax, accounting,
security, clinical, regulatory, or other qualified professional advice. Confirm
current requirements and obtain formal organisational approval where applicable.
