# Term Sheet Guide — Implementation Workbook

Version: 1.0
Published: 2026-07-27
Last updated: 2026-07-27
Owner: Rusaka Research
Review frequency: Every 6 months

## Decision statement

What decision must this workbook support?

________________________________________________________________________________

## Scope and exclusions

In scope:

________________________________________________________________________________

Out of scope:

________________________________________________________________________________

## Baseline evidence register

| Evidence item | Source | Date | Owner | Verified by | Status |
|---|---|---|---|---|---|
| | | | | | |
| | | | | | |
| | | | | | |

## Assumption register

| Assumption | Rationale | Decision affected | Downside case | Test | Owner | Review date |
|---|---|---|---|---|---|---|
| | | | | | | |
| | | | | | | |

## Options and decision criteria

| Option | Outcome | Feasibility | Cost | Time | Risk | Reversibility | Recommendation |
|---|---:|---:|---:|---:|---:|---:|---|
| | | | | | | | |
| | | | | | | | |

## Implementation plan

| Phase | Entry evidence | Actions | Owner | Control | Exit evidence | Due date |
|---|---|---|---|---|---|---|
| 1. Pilot — Term Sheet Guide | | During pilot, use Term Sheet Guide to move from an informed decision to controlled execution. Start with dated financial statements, operating metrics, contractual terms, and a reconciled assumption register. Name the accountable owner, the evidence reviewer, the decision deadline, and the output that proves this stage is complete. Record exclusions and unresolved questions rather than allowing them to disappear into narrative. The stage closes only when its evidence can be reproduced by someone who did not prepare it. | | | Required output: a decision record, implementation plan, and review log. | |
| 2. Scale — Term Sheet Guide | | During scale, use Term Sheet Guide to move from an informed decision to controlled execution. Start with dated financial statements, operating metrics, contractual terms, and a reconciled assumption register. Name the accountable owner, the evidence reviewer, the decision deadline, and the output that proves this stage is complete. Record exclusions and unresolved questions rather than allowing them to disappear into narrative. The stage closes only when its evidence can be reproduced by someone who did not prepare it. | | | Required output: a decision record, implementation plan, and review log. | |
| 3. Operations — Term Sheet Guide | | During operations, use Term Sheet Guide to move from an informed decision to controlled execution. Start with dated financial statements, operating metrics, contractual terms, and a reconciled assumption register. Name the accountable owner, the evidence reviewer, the decision deadline, and the output that proves this stage is complete. Record exclusions and unresolved questions rather than allowing them to disappear into narrative. The stage closes only when its evidence can be reproduced by someone who did not prepare it. | | | Required output: a decision record, implementation plan, and review log. | |
| 4. Discovery — Term Sheet Guide | | During discovery, use Term Sheet Guide to move from an informed decision to controlled execution. Start with dated financial statements, operating metrics, contractual terms, and a reconciled assumption register. Name the accountable owner, the evidence reviewer, the decision deadline, and the output that proves this stage is complete. Record exclusions and unresolved questions rather than allowing them to disappear into narrative. The stage closes only when its evidence can be reproduced by someone who did not prepare it. | | | Required output: a decision record, implementation plan, and review log. | |
| 5. Design — Term Sheet Guide | | During design, use Term Sheet Guide to move from an informed decision to controlled execution. Start with dated financial statements, operating metrics, contractual terms, and a reconciled assumption register. Name the accountable owner, the evidence reviewer, the decision deadline, and the output that proves this stage is complete. Record exclusions and unresolved questions rather than allowing them to disappear into narrative. The stage closes only when its evidence can be reproduced by someone who did not prepare it. | | | Required output: a decision record, implementation plan, and review log. | |

## Measures and thresholds

| Measure | Definition | Source | Baseline | Target | Threshold | Owner | Frequency |
|---|---|---|---:|---:|---:|---|---|
| | | | | | | | |
| | | | | | | | |

## Risk and control register

| Risk | Cause | Impact | Preventive control | Detective control | Owner | Residual risk |
|---|---|---|---|---|---|---|
| | | | | | | |
| | | | | | | |

## Review checklist

- [ ] 1. Change management: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 2. Documentation: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 3. Scenario analysis: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 4. Security and resilience: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 5. Data governance: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 6. Capability and resourcing: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 7. Scale readiness: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 8. Review and renewal: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 9. Decision boundary: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 10. Stakeholder map: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 11. Current-state baseline: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 12. Evidence design: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 13. Operating model: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.
- [ ] 14. Architecture and integration: evidence is linked, ownership is named, exceptions are recorded, and the current decision is clear.

## Approval record

| Role | Name | Decision | Conditions | Date |
|---|---|---|---|---|
| Accountable owner | | | | |
| Subject-matter reviewer | | | | |
| Risk or control reviewer | | | | |

## Authoritative references

- https://www.sebi.gov.in/ — Authoritative reference 1 for the evidence and standards relevant to Startups and Venture Capital. Confirm the current version and applicability before relying on it.
- https://www.startupindia.gov.in/ — Authoritative reference 2 for the evidence and standards relevant to Startups and Venture Capital. Confirm the current version and applicability before relying on it.
- https://www.ycombinator.com/documents — Authoritative reference 3 for the evidence and standards relevant to Startups and Venture Capital. Confirm the current version and applicability before relying on it.

## Related Rusaka resources

- https://www.rusaka.com/resources/guides
- https://www.rusaka.com/resources/guides/safe-note-guide
- https://www.rusaka.com/resources/checklists/due-diligence-checklist
- https://www.rusaka.com/resources/guides/investor-outreach-guide
- https://www.rusaka.com/resources/calculators/startup-valuation-calculator
- https://www.rusaka.com/resources/templates/startup-financial-model
- https://www.rusaka.com/resources/guides/startup-validation-guide

## Important limitation

This educational workbook does not replace legal, investment, tax, accounting,
security, clinical, regulatory, or other qualified professional advice. Confirm
current requirements and obtain formal organisational approval where applicable.
